Does anyone know if after rebuilding the Sitecore XDB Database will Sitecore continue to update the reporting and reporting.secondary databases?
Or after perform in the rebuild will Sitecore only update the reporting database and we will have to quickly change the connection strings to point at the secondary database? If this is the case will we lose data in the secondary database because of the interval between the rebuild completing and the connection strings being changed?
Sitecore Documentation for rebuilding is here: https://doc.sitecore.net/sitecore_experience_platform/81/setting_up_and_maintaining/xdb/server_considerations/walkthrough_rebuilding_the_reporting_database